Download Brochure

Guarapuava Plant

THE MOST MODERN LATIN AMERICA PINE MOULDING FACTORY

Distributed in 130,000 m², with the highest technology level at all stages of the process, detail planned structure and sustainability practices, Guarapuava plant in Paraná (Brazil) will open 400 new jobs and will work in synergy with the current plant in Quedas do Iguaçu (Paraná – Brazil), expanding the company’s activities.

The commitment to sustainability is present throughout the Araupel´s production chain: the biomass generated from the production process serves markets such as power generation, ceramic and poultry industries; It’s industrial machineries are equipped with the highest technology scanners enable maximum utilization of the wood, reducing the loss of raw materialsThe overhead lighting allows the entry of natural light and local ventilationAn artificial lake of 4,500 m³ for rainwater retention, equivalent to 2.5 months of operation, to be used in the boiler, for machinery and equipment washing, among other processes, further strengthening the sustainable nature of the company.

Araupel is a company that cares about people and like a Forest, it’s a industry in constantly growth, being strong, consistent and solid. And that’s why it provides quality in every product delivered to their customers.